CME Blog

GLENWOOD CANYON CLOSURE FOR REPAIR WORK ON MARCH 8 (CLICK FOR FULL STORY)

Posted On: 03/04/2016

CDOT Annouces Glenwood Canyon Road Closure 9 a.m to 4 p.m. on March 8

CDOT mandates Road Closure to Install Rockfall Mitigation

On Tuesday, Mar. 8 there will be a daytime closure from 9:00 a.m.- 4:00 p.m. through Glenwood Canyon from exit 116 (Glenwood Springs) to exit 133 (Dotsero). Colorado department of Transportation crews are working to complete the rockfall mitigation fencing utilizing a helicopter and continued road repairs in an effort to move the traffic configuration into one-lane in each direction next...

CME RESUMES REGULAR SHUTTLE SCHEDULE BETWEEN DIA AND ASPEN/SNOWMASS (Click for Full Story)

Posted On: 03/02/2016

Road is now open 24 hours/ day - Expect 30-60 Minute Delays in Slide Area

Road Repair Continues - 1 Lane Open in Area of Slide

Colorado Department of Transportation has re-opened Glenwood Canyon for travel. After multiple rock slides closed the road, and then bad weather delayed repair work, the road is now open 24 hours/ day. All traffic is using the eastbound lanes. Because of the one lane "head to head" traffic configuration, this is a NO PASSING area through the Canyon, which slows down travel. Future...

Glenwood Canyon Update - 1 Lane is Open, 24 Hours/ Day With a Pace Car Configuration (Click for Full Story)

Posted On: 02/25/2016

One lane of Travel is Available/ 24 Hours a Day

For Shuttle Availability, Please Call 970-754-7433

Colorado Department of Transportation has opened 1 lane of traffic through Glenwood Canyon. This will be open 24/7, pending safe conditions, with a pace car configuration. Please see www.CoTrip.org for the most up-to-date information,including notifications on any changes that may be necessary to facilitate the repair work from rock slides on 2/15/2016.

Shuttle Info: CME is taking...

Colorado Department of Transportation Opens Glenwood Canyon 4pm - 9am (Click For Full Story)

Posted On: 02/23/2016

Limited Travel through Glenwood Canyon

One Lane Open for Travel 4pm - 9am When Safe

Update #4, 2/23/16

Glenwood Canyon has been reopened by Colorado Department of Transportation on an extremely limited basis. The current plan implemented by CDOT is to open one lane of traffic from 4 PM to 9 AM, with a pilot car guiding cars in one direction at a time. The Canyon is closed to all traffic between 9 AM and 4 PM daily to allow for repair of the road, which is estimated to cost around $5...

Glenwood Canyon Closure - Update #3 (click for full details)

Posted On: 02/19/2016

I-70 remains closed in both directions between Glenwood Springs and Gypsum due to a rockslide. I-70 is likely to remain closed through the weekend, per Colorado Department of Transportation, as inclement weather has created delays in crews’ progress bringing additional rocks down onto the highway and restoring safety. Ultimately, the opening time and day will be dependent CDOT’s...

Update from CDOT on Glenwood Canyon (click for full story)

Posted On: 02/18/2016

CDOT Updates Glenwood Canyon Re-Opening Date

Earliest Re-opening date is Saturday, 2/20/16

I-70 remains closed in both directions between Glenwood Springs and Gypsum due to a rockslide. I-70 is likely to remain closed at least until Saturday, as inclement weather has created delays in crews’ progress bringing additional rocks down onto the highway and restoring safety. Ultimately, the opening time and day will be dependent CDOT’s ability to complete mitigation and clear...

I-70 through Glenwood Canyon is Closed Due to RockSlides

Posted On: 02/17/2016

CDOT Scheduled to reopen I-70 on Thursday, Feb 18th

Scaling Operations In Progress - Plans to Re-open on Late Afternoon on Thursday, Feb 18th

Glenwood Canyon Closure

During the Glenwood Canyon closure period, CME will be taking requests for Aspen to/from Grand Junction airport on both our Charter and Premier services. We are accommodating a few reservations to Grand Junction Airport, and there remains some additional availability for these services.

CME is planning to have drivers available Thursday, February 18th, in the afternoon to pick up guests...

Ullr Is Back!

Posted On: 01/07/2016

UllrFest in Breckenridge

Breckenridge's Annual Ullr Fest starts on January 13, with events through January 16. There’s a list of events and no shortage of fun this annual event celebrating all things cold and snowy! In Norse mythology Ullr (pronounced Ool-er) was the god of winter. Ullr loved the cold, and delighted in traveling over the country on his skis or skates. Here's how to celebrate Ullr in...

Ullr Fest Celebration of Winter

EPIC DAY PASS - LEARN MORE >>

Posted On: 12/28/2015
Have an EpicDay - Lift Ticket Information

snow.com/epicday

The snow is fantastic and you cannot wait to hit the slopes. If you plan to buy a lift ticket at the Resort, save valuable time and buy the EpicDay Lift Ticket online at www.snow.com/epicday . You can save up to 25% off the window price, and buying online allows you to pick up the ticket at the EpicDay Express Lane at each resort. The convenience factor is huge, and wouldn’t you rather...

HAPPY HOLIDAYS FROM CME

Posted On: 12/24/2015
Celebrate the Season!

Vail Snowmen

It is a White Christmas in Colorado! With excellent December snows and a diverse line up of holiday festivities, the snowy mountains are the perfect backdrop to a family vacation. Save some time and energy for after the slope fun. Check out some ways to celebrate!

In Beaver Creek, the Golden Dragon Acrobats are at the Vilar Performing Arts Center on December 26-27. While not exactly...

Page 2 of 3 pages  < 1 2 3 >