CME Blog

Glenwood Canyon Update - 1 Lane is Open, 24 Hours/ Day With a Pace Car Configuration (Click for Full Story)

Posted On: 02/25/2016

One lane of Travel is Available/ 24 Hours a Day

For Shuttle Availability, Please Call 970-754-7433

Colorado Department of Transportation has opened 1 lane of traffic through Glenwood Canyon. This will be open 24/7, pending safe conditions, with a pace car configuration. Please see www.CoTrip.org for the most up-to-date information,including notifications on any changes that may be necessary to facilitate the repair work from rock slides on 2/15/2016.

Shuttle Info: CME is taking...

Colorado Department of Transportation Opens Glenwood Canyon 4pm - 9am (Click For Full Story)

Posted On: 02/23/2016

Limited Travel through Glenwood Canyon

One Lane Open for Travel 4pm - 9am When Safe

Update #4, 2/23/16

Glenwood Canyon has been reopened by Colorado Department of Transportation on an extremely limited basis. The current plan implemented by CDOT is to open one lane of traffic from 4 PM to 9 AM, with a pilot car guiding cars in one direction at a time. The Canyon is closed to all traffic between 9 AM and 4 PM daily to allow for repair of the road, which is estimated to cost around $5...

Glenwood Canyon Closure - Update #3 (click for full details)

Posted On: 02/19/2016

I-70 remains closed in both directions between Glenwood Springs and Gypsum due to a rockslide. I-70 is likely to remain closed through the weekend, per Colorado Department of Transportation, as inclement weather has created delays in crews’ progress bringing additional rocks down onto the highway and restoring safety. Ultimately, the opening time and day will be dependent CDOT’s...

Update from CDOT on Glenwood Canyon (click for full story)

Posted On: 02/18/2016

CDOT Updates Glenwood Canyon Re-Opening Date

Earliest Re-opening date is Saturday, 2/20/16

I-70 remains closed in both directions between Glenwood Springs and Gypsum due to a rockslide. I-70 is likely to remain closed at least until Saturday, as inclement weather has created delays in crews’ progress bringing additional rocks down onto the highway and restoring safety. Ultimately, the opening time and day will be dependent CDOT’s ability to complete mitigation and clear...

I-70 through Glenwood Canyon is Closed Due to RockSlides

Posted On: 02/17/2016

CDOT Scheduled to reopen I-70 on Thursday, Feb 18th

Scaling Operations In Progress - Plans to Re-open on Late Afternoon on Thursday, Feb 18th

Glenwood Canyon Closure

During the Glenwood Canyon closure period, CME will be taking requests for Aspen to/from Grand Junction airport on both our Charter and Premier services. We are accommodating a few reservations to Grand Junction Airport, and there remains some additional availability for these services.

CME is planning to have drivers available Thursday, February 18th, in the afternoon to pick up guests...